A solar power trailer, also sold as a solar generator trailer or mobile solar generator, pairs solar panels, a LiFePO4 battery and an inverter on a towable chassis, with a small diesel generator as backup for cloudy runs or heavy loads. If you are comparing a solar trailer for sale from several suppliers, the listings only make sense once you know your own numbers. Pick the inverter size first from your actual load list, then the battery capacity for the autonomy you need, then the solar array to replace what the battery uses each day. This guide walks through that sizing order using the VTS8P ESS, VTS12P ESS and VTS20P ESS as reference units.
Solar power trailer vs solar lighting trailer: not the same tool
A solar panel trailer can mean two different machines, and mixing them up leads to the wrong quote. Solar lighting trailers exist to run LED floodlight masts and little else. A solar power trailer, or solar generator trailer, is built around a general-purpose inverter and AC output sockets, so it runs power tools, a site office, a water pump, telecom equipment or a small workshop. The VTS8P ESS, VTS12P ESS and VTS20P ESS belong to this second category: each pairs a Victron Quattro inverter bank, LiFePO4 storage and solar MPPT charging with a diesel generator that starts on its own once stored power runs low.
Sizing the inverter (PCS) power
Start by listing every load that could run simultaneously, not just the biggest one. Add up continuous running watts, then separately note starting or surge current for anything with a motor - pumps, compressors, fridges - because that surge can be several times the running figure for a second or two. The motor nameplate or its supplier gives the real value. The inverter’s continuous rating has to cover your worst-case simultaneous load, and its peak rating has to clear the surge.
The VTS8P ESS carries a single 15 kVA Victron Quattro inverter, sized for single-phase job-site loads.
The VTS8P ESS runs a single Victron Quattro rated 15,000 VA / 12,000 W continuous with a 25,000 W peak, enough for lighting strings, hand tools, a small split AC unit and a site office. The VTS12P ESS and VTS20P ESS step up to three Quattro units, each rated 10,000 VA / 8,000 W continuous with a 20,000 W peak, for 30 kVA in total and a three-phase output for motors, welding sets or larger HVAC loads. If your load list already approaches 10 kW continuous, size up rather than running the 15 kVA unit near its 12,000 W ceiling every day: you keep headroom for the loads nobody listed.
Sizing the LiFePO4 battery for the autonomy you need
Battery sizing comes down to one question: how many hours or days do you need to run on stored energy alone before the generator or sun has to pick up the load again? Multiply your expected load in kW by the hours you want covered, and compare that to the usable battery capacity - keeping in mind a LiFePO4 pack is not normally run to zero, so real-world autonomy is a bit less than the nameplate kWh suggests.
The VTS8P ESS carries 30.7 kWh across six AK-B-LV-EH5.0 modules; the VTS12P ESS and VTS20P ESS both carry 51.2 kWh across ten modules. All three packs are rated for 6,000 cycles. As an example, a steady 3 kW load runs for roughly 10 hours on the VTS8P ESS battery alone before solar or the Yanmar 18 kVA set has to recharge it, and a steady 5 kW load runs for roughly 10 hours on the 51.2 kWh pack. Larger continuous loads, such as a borehole pump or telecom racks running 24/7, eat into that autonomy faster, which is where the bigger pack on the VTS12P ESS or VTS20P ESS earns its keep.
Sizing the solar array to match daily consumption
The solar array’s job is to replace what the battery gave up overnight, every day, without the generator doing all the work. As a planning assumption, a site with four to five hours of usable peak sun can expect its array to deliver roughly that many hours of rated output per day - less in winter or under heavy cloud, more in a dry, high-irradiance region like inland Australia or the US Southwest. On that assumption, the 5.4 kW array of a VTS12P ESS would produce about 22 to 27 kWh on such a day before system losses, and the 9 kW array of a VTS20P ESS about 36 to 45 kWh. These are planning figures, not a promise for your site. Compare the expected daily harvest to your daily consumption in kWh, not just to the inverter’s power rating.
Twelve 450 W panels on the VTS12P ESS recharge the 51.2 kWh pack during the day, so the generator runs less at night.
The VTS8P ESS carries 8 x 380 W panels (about 3 kW of array), the VTS12P ESS carries 12 x 450 W (about 5.4 kW), and the VTS20P ESS carries 20 x 450 W, around 9 kW - the largest standard array in the range. If your site’s daily consumption outruns what even the 9 kW array can replace on an average day, the generator covers the gap, or the project belongs on a larger system. The separate VTS20P solar PV trailer is a towable 9 kW array designed for the VMHV160K3 hybrid ESS; compatibility with any other system is confirmed for each project.
When the diesel generator backup matters
Solar and battery alone work well for intermittent loads and sites with decent sun. They struggle in three situations: multiple consecutive overcast days, continuous heavy loads that drain the battery faster than solar can refill it, and the first few days on a brand-new site before a load profile is well understood. That is why all three ESS trailers ship with a generator wired into the system rather than as a separate add-on. The VTS8P ESS pairs with an 18 kVA Yanmar set; the VTS12P ESS and VTS20P ESS both pair with a 35 kVA Hatz set. In each case the generator starts automatically when the battery needs charging or the load is too high. Both generators have a 130 L fuel tank and a noise level of 75 dB(A) at 7 m.
For the logic behind running a generator fewer hours, see our article on how a solar, battery and diesel hybrid system works.
Single-phase vs three-phase: which to specify
Single-phase 230 V covers most lighting circuits, hand power tools, small split AC units and site office loads - this is what the VTS8P ESS outputs through its one Quattro inverter. Three-phase 230 V is needed for larger motors, compressors, welding equipment and some HVAC systems; the VTS12P ESS and VTS20P ESS both deliver this through their three-unit Quattro bank, with AC output sockets rated for 63 A and 32 A circuits. Before ordering, check the nameplate on your largest pieces of equipment - a three-phase compressor on a single-phase trailer simply will not start, no matter how large the inverter’s wattage rating looks on paper.
50 Hz and 60 Hz: matching grid standards across regions
Australia, New Zealand and most of Asia run 50 Hz grids; the United States and Canada run 60 Hz. The published datasheets for the VTS8P, VTS12P and VTS20P ESS describe the standard 230 V, 50 Hz units. A 60 Hz version of the VTS trailers is available for 60 Hz countries. Frequency is only part of the answer in North America, where site voltages and sockets also differ: state the voltage your equipment needs and your destination country, and the output and sockets are confirmed in the quotation.
Solar power trailer comparison at a glance
| Spec | VTS8P ESS | VTS12P ESS | VTS20P ESS |
|---|---|---|---|
| Inverter (PCS) | 15 kVA, single-phase 230 V | 30 kVA, three-phase 230 V | 30 kVA, three-phase 230 V |
| Solar array | 8 x 380 W | 12 x 450 W | 20 x 450 W (9 kW) |
| Battery | 30.7 kWh LiFePO4 | 51.2 kWh LiFePO4 | 51.2 kWh LiFePO4 |
| Diesel generator | 18 kVA Yanmar | 35 kVA Hatz | 35 kVA Hatz |
| Footprint (L x W x H) | 2,480 x 2,150 x 1,690 mm | 4,015 x 2,200 x 2,750 mm | 4,500 x 2,200 x 2,500 mm |
| Container loading | 2 per 20 ft, 4 per 40 ft | 4 per 40 ft | 4 per 40 ft |
For sites that outgrow a 30 kVA unit, the VMHV160K3 hybrid system steps up to 160 kW with a 225 kWh LiFePO4 battery and a 100 kVA Perkins generator, on a heavy-duty trailer.
What to send for an accurate quote
A quote comes together fastest when you can give us the following in one message:
- A load list: every device, its running watts, and which ones might run simultaneously
- Motor loads with starting current or locked-rotor amps, not just running watts
- Single-phase or three-phase requirement, based on your actual equipment
- Site location and season, so we can comment on expected solar performance
- Hours or days of battery autonomy you want without sun or generator
- Destination country and required voltage, since these set frequency (50 or 60 Hz) and socket standard
- Any noise limits on site (rural, next to housing, mine camp)
- Whether the trailer joins a rental fleet (standard config) or needs branding/custom sockets
This is the same information our team uses whether the buyer is a construction contractor running a single job site, a rental fleet stocking several units for different clients, or a mining operator powering a remote camp.
Get a trailer sized to your load, not a generic spec sheet
Send your load list and site details through our quote request form. We will size the inverter, battery and solar array against your actual numbers, confirm single or three-phase and the frequency for your country, and tell you straight if a VTS8P, VTS12P, VTS20P ESS or a larger system is the better fit.
Frequently asked questions
What is a solar power trailer?
A solar power trailer (also called a solar generator trailer) combines solar panels, a LiFePO4 battery, an inverter and often a small diesel generator on one towable chassis. It supplies AC power to tools, site offices, pumps or telecom loads without a grid connection, and differs from a solar light tower, which is built only to run LED floodlights.
How long can a solar power trailer run without sun?
It depends on the load and the battery size. As an example, the 30.7 kWh battery of a VTS8P ESS can run a steady 3 kW load for roughly 10 hours, and the 51.2 kWh battery of a VTS12P ESS or VTS20P ESS a steady 5 kW load for roughly 10 hours. For multi-day cloud cover or higher loads, the built-in diesel generator is what keeps the site running, not the battery alone.
Can a solar power trailer run three-phase equipment?
Yes, if you choose a three-phase model. The VTS12P ESS and VTS20P ESS output three-phase 230 V through their Victron Quattro inverter bank. The VTS8P ESS is single-phase 230 V, suited to lighting, small tools and single-phase site offices rather than three-phase motors or compressors.
Is the diesel generator always running?
No. On the VTS8P, VTS12P and VTS20P ESS units the Yanmar or Hatz generator starts automatically only when the battery's charge level drops below a set point or when a load spike exceeds what the battery and solar can cover, then shuts down once the battery recovers.
Do you offer 60 Hz trailers for the US and Canada?
Yes. The published datasheets describe the standard 50 Hz units, and a 60 Hz version of the VTS trailers is available for 60 Hz countries. Voltage and socket standard are confirmed for each project in the quotation, so tell us your destination country and the voltage your equipment needs.