A hybrid generator pairs a diesel engine with a LiFePO4 battery and, in most configurations, solar panels, all under one controller. The battery and solar carry the base load; the engine wakes only to top up the pack or handle a peak, rather than idling all night at a fraction of its rated output. Every figure in this guide comes straight from the published datasheets, covering units from 15 kVA to 160 kW, so you can match capacity to your load profile with real numbers.
What a hybrid generator is and how it differs from a standalone genset
A standalone diesel generator is sized for the site’s peak demand, then runs continuously at whatever load the site actually draws, often far below that peak overnight. A hybrid generator adds a battery bank and PCS (power conversion system) in front of the engine. Loads are served from the battery first; the engine wakes on a schedule or state-of-charge trigger, runs at a steady load to top the pack back up, then shuts down again. For a full explanation of how the battery, solar and diesel engine work together inside one of these systems, see our guide to how a solar-battery-diesel hybrid system operates.
Why engine hours matter more than fuel burn alone
Fleet managers quoting diesel-only equipment usually think in liters per hour. That number matters, but engine hours drive the real cost: scheduled services, oil and filter changes, and the resale value of the unit all track hours on the clock, not fuel spent. A genset sized for a site’s daytime peak is oversized for the small load it carries at night - lights, telemetry, a few fans - and it still accumulates hours at that partial load.
The VP3K hybrid light tower illustrates the principle at small scale: the battery carries the load and the diesel engine only tops it up.
The clearest documented example in our range is a light tower, not a generator, but the mechanism is identical. The diesel-only VP3K Diesel burns about 1 L/h from its 108 L tank for roughly 108 hours of continuous light. The hybrid VP3K, with the same Kubota engine and a 5 kWh LiFePO4 battery added, runs its engine at about 0.3 L/h because the battery carries most of the load. For the full side-by-side comparison, see VP3K hybrid vs diesel light tower. The same math applies to a hybrid generator trailer: the 225 kWh battery on the VMHV160K3 or the 241 kWh pack on the VMHV180K3 is there to let the Perkins engine run in short, efficient charge cycles rather than grinding through the night at a fraction of its rated output.
Sizing framework: answer these four questions first
Before comparing kVA numbers, work through the load profile with the site team. For a broader walkthrough of the same process applied to stationary battery storage, see how to size a commercial battery storage system.
- Continuous base load - what draws power 24/7 (lighting, telemetry, refrigeration, HVAC)?
- Peak load - what starts occasionally and for how long (pumps, compressors, welding)?
- Desired autonomy - how many hours or days should the battery and solar carry the site without the engine running, accounting for cloudy periods?
- Country and grid standard - voltage, frequency and plug configuration vary between Australia, the US, Canada, New Zealand and Gulf states; these are confirmed per project rather than fixed on every datasheet.
Once those four answers are on paper, the rest of the sizing exercise is matching datasheet numbers against them rather than guessing.
Hybrid generator options from 15 kVA to 160 kW
The VTS12P ESS pairs a 30 kVA three-phase inverter bank with a 35 kVA Hatz diesel generator for sites that need three-phase power on a single towable trailer.
The table below lists the units between a small single-phase trailer and the 160 kW flagship; every number comes straight from each product’s own datasheet.
| Model | Power rating | Battery | Diesel generator | Solar input | Format |
|---|---|---|---|---|---|
| VTS8P ESS | 15 kVA, single-phase 230 V | 30.7 kWh LiFePO4 | 18 kVA Yanmar | 8 × 380 W | Trailer |
| VTS12P ESS | 30 kVA, three-phase | 51.2 kWh LiFePO4 | 35 kVA Hatz | 12 × 450 W | Dual-axle trailer |
| VTS20P ESS | 30 kVA, three-phase | 51.2 kWh LiFePO4 | 35 kVA Hatz | 20 × 450 W (9 kW) | Compact enclosure |
| VMHV160K3 | 160 kW system / 100 kW PCS | 225 kWh LiFePO4 | 100 kVA Perkins | 4 MPPT, up to 50 kW DC/DC | Heavy-duty trailer |
For a single-phase job site running lighting, tools and a site office, the 15 kVA VTS8P ESS with its 30.7 kWh battery and 18 kVA Yanmar backup is usually enough. Where the site needs three-phase power - three-phase tools, pumps or a telecom shelter with three-phase HVAC - the 30 kVA VTS12P ESS and VTS20P ESS share the same 51.2 kWh battery and 35 kVA Hatz generator, but the VTS20P ESS carries more solar panels (20 × 450 W against 12 × 450 W) for sites that get long sun hours and want fewer engine starts. Both are a direct alternative to running a standalone 30 kW diesel generator continuously; see our breakdown of a 30 kW mobile battery system as a diesel generator alternative for the comparison in more detail.
At the top of this bracket, the VMHV160K3 steps up to a 160 kW system that pairs a 100 kW PCS with a 225 kWh LiFePO4 battery and a 100 kVA Perkins 1104C-44TAG2 generator carrying a 680 L tank. It suits a construction site running several site offices, pumps and three-phase tools at once, or a remote camp with a mixed three-phase load that a 30 kVA trailer cannot cover on its own. It also supports off-grid, grid-connected and parallel-with-generator operation, so it can sit alongside existing site generators rather than replacing them outright.
Beyond 160 kW: scaling up to larger systems
The VMHV180K3 raises PCS power to 125 kVA and battery capacity to 241 kWh while keeping the same 100 kVA Perkins generator as the VMHV160K3.
If the load profile grows past what a 160 kW trailer can hold, the next step in the lineup is the VMHV180K3, which raises the PCS to 125 kVA and the battery to 241 kWh while adding a larger 62.5 kW solar DC/DC input across four MPPT channels, on the same 100 kVA Perkins engine. For mining camps, large motor loads or multi-building sites that outgrow a trailer-mounted unit entirely, the VMHV500K3 puts a 250 kW Perkins generator and up to 482 kWh of LiFePO4 storage in a single 20 ft container.
Weight, logistics and towing considerations
Electrical output is only half the sizing equation for a hybrid generator. The VTS8P ESS, VTS12P ESS and VTS20P ESS are trailer-mounted, so check them against your towing vehicle and the trailer rules of the destination country; the VTS12P ESS weighs 4,000 kg and four units fit in a 40 ft container. The VMHV160K3 weighs 6 t, and its datasheet lists container loading as 1 × 20 ft or 3 × 40 ft - figures that matter when planning multi-unit shipments or working out permit requirements for road transport in states and provinces with axle weight limits.
What to send for an accurate quote
A hybrid generator quote firms up fast once we have three things from the site team:
- Load profile - continuous base load in kW, peak load and duration, and whether the supply needs to be single-phase or three-phase.
- Country and site standard - Australia, the US, Canada, New Zealand or a Gulf state, including any local voltage, frequency or plug requirements.
- Desired autonomy - how many hours the battery and solar should carry the site before the engine has to start, and whether solar panels are wanted on day one or added later.
Send those three points through our quote request form and we will size the unit - from a 15 kVA single-phase trailer to a 160 kW system or higher - against the actual numbers rather than a generic recommendation.
Frequently asked questions
What exactly is a hybrid generator?
It is a diesel generator paired with a LiFePO4 battery and, usually, solar panels, managed by a controller that decides whether the load is served from battery, solar or the engine. The diesel engine becomes a backup and recharge source instead of the only source of power.
How many engine hours can a hybrid generator actually save?
It depends on the load profile and how much solar the site gets, so we do not quote a fixed percentage. As a documented reference point, the VP3K hybrid light tower runs its diesel engine at about 0.3 L/h because the battery carries most of the load, versus 1 L/h on the diesel-only VP3K version. The same logic - battery carries the base load, engine tops it back up - applies to the larger hybrid generator trailers.
Are these trailers available at 60 Hz for the US and Canadian market?
Yes. The published datasheets describe the standard 50 Hz units, and a 60 Hz version of the VTS trailers and of the VMHV range is available for 60 Hz countries. Voltage and socket standard are confirmed for each project in the quotation, so tell us your destination country and the voltage your equipment needs.
What is the difference between the kVA rating and the kW rating on the spec sheet?
kVA is the generator's rated apparent power; kW figures refer to the battery inverter (PCS) or the system's continuous real power rating. On a unit like the VMHV160K3, the system is rated 160 kW overall while the PCS itself is rated 100 kW continuous - check both numbers against your load.
Can a hybrid generator trailer run in parallel with an existing diesel genset already on site?
Several models in this range, including the VMHV160K3 and VMHV180K3, support off-grid, grid-connected and parallel-with-generator operating modes, so they can be added alongside equipment already deployed on a project.